    Context

    Brio Refining, Inc. 58 acres located in Harris County, Texas. The company operated a chemical mixing and processing plant on the Portal from the 1950s to 1982. Chemical disposal practices have resulted in contamination of groundwater, topsoil and soil with hazardous fatty acids. Following the purge, the EPA removed the 2006 World Wide Web site from the Superfund’s National Priority List (NPL).

    Current status
    Elevated concentrations of pollutants in field waters have been detected in sandy waters fifty feet from the Brio site (FFSZ). Brio Working Group completes fieldwork for a large FFSZ groundwater survey at multiple locations at and beyond the data facility and to evaluate further corrective action if necessary.

    The site was removed from the national priority list in December 2006. The fourth five-year review was completed in September 2013 and showed that the site was meeting the generalization deadline. Corrective actions have eliminated exposure pathways that could lead to unacceptable risks by preventing exposure of the recipient human populations, such as air, contaminated soil and groundwater. Long-term protection is ensured by continuous monitoring of air, groundwater and surface water to assess the effectiveness of control at the site. The affected groundwater from the NRF, currently under study, will be assessed in a forthcoming review, which is expected to be completed over a five-year period by 2018.

    This 58-acre hotel is located nearly 20 miles south of Houston at 2501 Dixie Farm Road in southern Harris County, Texas. The Brio Refinery was used as the only refinery and chemical processing facility from the 1950s to 1982. Nearby residential complexLex (now abandoned and usually with houses demolished) was located north of the site’s northern edge. The Mud Ravine, a large trench and local tributary beyond Clare Creek, runs along the border with the United States. Most of the raw materials available for processing on Brio were stored in many local human pits, such as on Brio Nord. However, storage facilities were located both at the Brio sites and in the north and south. Undoubtedly, all mines were closed prior to the closure of the plant in December 1982.

    Most of the contamination on the site is undoubtedly located next to other areas of the storage pits. On March 26, 1988, the Environmental Protection Agency published its decision, according to which fires in selected areas along with pits debris, removal of surface infections, improvement of ravine sewerage are similar to demobilization of ravine magnets, the remaining processing equipment, disposal is carried out using dense liquids of a non-aqueous phase ( DNAPL), as well as equipment for pumping and treating groundwater at multiple sand channel locations (NSCZ).

    EarthlingsOperations commenced at Pit On Are Brio South and emissions issues during the excavation resulted in the operation to be halted. Subsequently, on July 2, 1997, the amended dossier was signed, as well as the decision of the Environmental Protection Agency “Term of validity of groundwater and monitoring, improvement of the canal for a mud ravine”.

    Benefits
    Completion of activities in 2004 resulted in long-term mitigation of risks to human well-being. The underground barrier also ensured that virus-contaminated groundwater was trapped underground and that the network did not enter the home’s surface water. A multi-layer roofing system at the construction site reduces the risk of quick contact with residual waste on the construction site.
    The site is ready for its intended use (non-residential) today, although future use should not violate the upper limit of the materials supplied.

    History of the National Priority List (NPL)
    Date proposed for deletion 05/10/1984:
    Final date: 03/31/1989
    Proposed deletion date: 06/23/2006
    Final deletion date: 28.12. 1989. 2006

    What Happened Todone To Clean Up This Site?

    The Site was created by the actions of the United States of America and Potentially Responsible Halloween Parties (PRP).

    The EPA has provided several advisory opinions on fixing the website over a five-year period. This feedback ensures that the corrective actions taken protect public health and the environment and work as intended throughout the entire document location decision-making process. The latest published review concluded that the on-site response is consistent with the therapeutic agent chosen by the EPA so that the agent continues to serve in the short term to protect human health and the environment. Due to constant protection, corrective action requires constant monitoring of air, groundwater and surface consumption.

    Refining consisted of extracting petrochemicals from various sources, most of the material being tailings, tank bottoms and hence tar from other off-site processes Dki. Refining operations included regeneration combined with copper catalysts, recovery of ethylbenzene to produce styrene resin, recovery of chemicals from chlorinated hydrocarbons, and production of chemical compounds. The site owner kept most of the raw materials in pits for processing. The website owner ceased all launches prior to shutting down in 1982.

    What Is The Current State Of The Site?

    In the long term, digging and removal of unsanitary soil, rubble and barrels will be excluded; Other functions of sewage treatment plants; and even maintenance and monitoring. The EPA subsequently corrected this by integrating a vertical barrier wall, website, shelter, groundwater pumping system and, as a result, maintenance and stabilization of the dust channel. The construction of the protective equipment was completed in 2004. Repair work at the facility continues.

    Activity And Usage Restrictions

    brio plant cleanup

    These sites and activity restrictions, as required by the EPA for institutional control, are related to position. Institutional control measures play a role in local corrective action as they reduce the burden of pollution by minimizing the consumption of land or resources.They also provide advice and tips on human behavior. For example, a zoning restriction prevents uses of land – for example, use of residential areas – that do not meet the level associated with clean-up.

    brio plant cleanup

     

     

     

     

     

    Brio Plant Opruimen
    Limpeza De Planta De Brio
    브리오 식물 정화
    Ochistka Zavoda Po Proizvodstvu Brio
    Nettoyage Des Plantes Brio
    Brio Pflanzenreinigung
    Pulizia Delle Piante Brio
    Sanering Av Brio Vaxter
    Czyszczenie Roslin Brio